Cotton construction
Wide-Width Cotton Fabric — up to 140 Inches, Woven Seamless
The 140-inch capability, across duck, canvas and sheeting.

Most mills top out between 63 and 98 inches, so wide cloth almost always means a seam. Our looms run to 140 inches (about 356 cm). That removes the centre seam from wide sheeting, upholstery base, tent and marquee panels, dust sheets and scenic print cloth — and removes the cutting and labour that go with matching a seam. Available in duck, canvas, sheeting and drill constructions.
Specification
- Weave
- Plain, twill and basket, to construction
- Construction examples
- Duck 12x12 / 60x44 · Canvas 10x10 / 52x36 · Sheeting 40x40 / 110x90
- Weight
- 90–680 g/m² (3–20 oz)
- Width
- 100 to 140 inches (up to 140" / ~356 cm)
- Supplied as
- GREIGE, RFD, DYED, PRINTED
- Fibre
- 100% cotton
Indicative ranges. The exact article, yarn count, ends and picks per inch, GSM and width, is confirmed at RFQ.
Ordering
- Minimum order
- 100 m greige · 1000 m per colour processed
- Lead time
- about 2 days greige · about 2 weeks processed
- Incoterms
- FOB Mundra / Nhava Sheva · CIF destination port
- Price
- Per metre or per kg, band on request
Payment 10% on order, 15% at production start, 50% on passing QC, 25% on dispatch. OEKO-TEX and GOTS applied for and in progress as of September 2026, not yet granted. Organic cotton available now. SMETA not pursued.
Finishes
- RFD
- Piece-dyed
- Water-repellent
- Coated via partners
Typical uses
- Seamless wide bedding and sheeting
- Tent, marquee and awning panels
- Wide upholstery and mattress base
- Scenic and backdrop cloth for film and theatre
- Painters' dust sheets
Wide-Width Cotton for a specific use
Common questions
What's your minimum order?
100 m for greige, 1,000 m per colour for processed fabric. No full-container minimum.
How wide can you weave?
Up to 140 inch (about 356 cm). Most mills top out at 63 to 98 inch, so wide cloth usually means a seam. Here it doesn't.
How fast is delivery?
Greige in about 2 days, processed in about 2 weeks. That's production time; sea transit is on top. Market norm is 30 to 45 days.
Can you do RFD so we dye locally?
Yes. RFD by the roll is a core line. MOQ 100 m as greige, or take it RFD.
Do you weave linen too?
Yes, cotton and linen. Linen roughly 120 to 250 GSM. Send the construction or end use and we'll confirm what we can run.
What's the price per metre?
Depends on construction, width, finish and quantity. Send the spec, or the end use, and we'll quote. Priced per metre or per kg.