Quality
Six checkpoints, followed through the route.
From yarn to finished roll — not a single inspection at the end. Each checkpoint is against your specification, not a generic standard.
- 01
Yarn verification
Count, composition, lot and twist (where applicable) verified against your construction before sizing.
- 02
Warp preparation
Ends, sizing and tension checked in our own sizing plant, ahead of weaving.
- 03
Loom construction
EPI, PPI, weave and width checked against your specification on the loom.
- 04
Greige inspection
Defects, width, GSM and roll length checked before the fabric moves to processing.
- 05
Processing control
Where processing is required: shade, shrinkage, fastness and finish controlled against your approved lab dip and specification.
- 06
Final inspection
Construction, width, GSM, appearance and packing checked before dispatch.
An example inspection record
A sample QC record is available on request rather than published generically here — ask for it alongside your test requirements and we will share a real one relevant to your construction.
Have specific test requirements?
Tolerances, test methods and certifications required for your market — tell us and we will confirm what we can test for and what needs an external lab.
Ask for test requirements